The problem
NR-13 doesn't forgive delays: an overdue inspection on a boiler or pressure vessel means risk of shutdown, and the evidence has to be ready the day the inspector arrives. In practice, the equipment record is in a physical folder, the schedule in a spreadsheet, and the report with the qualified professional who ran the last inspection.
- Paper equipment records, incomplete or out of date
- Inspection schedule tracked in a spreadsheet
- Reports scattered across email and contractors
- Expiry discovered only once it has already passed
- Risk of equipment shutdown and production stoppage
Who it's for
Maintenance engineering
Health and safety
Qualified professionals
Plant management
How it works
Every boiler, vessel and pipeline with its design data and history.
Technical documentation organized per equipment, always accessible.
Automatic scheduling according to category and applicable frequency.
Field recording, offline, with automatic generation of the final report.
What's included
Digital record per equipment
Schedule with preventive alerts
Offline field app
Automatic report generation
Integrity history
Inspection-ready package
Measurable gains
Integrations
- Signed PDF report export
- Integration with the maintenance system to raise work orders
- Email and WhatsApp alerts to the responsible owner
- API to consume the schedule in BI tools
Standards covered
Management covers the documentation, frequency and inspection-record requirements applicable to boilers, pressure vessels and piping.
Frequently asked questions
Does the system issue the report or replace the qualified professional?
It doesn't replace them. The report remains the qualified professional's responsibility; the platform organizes the history, standardizes field recording and generates the formatted document from what they recorded.
Does it work in classified areas without signal?
Yes. Field recording is offline and syncs when the connection returns.
Can we migrate paper records?
Yes. The existing archive is digitized and linked to the corresponding equipment, becoming part of its integrity history.
How far in advance are alerts sent?
Lead time is configurable per equipment type and criticality, to accommodate contracting and shutdown windows.
What does the evidence look like on inspection day?
The per-equipment evidence package is generated on the spot, with records, schedule and current reports.
Social proof
With NR-13 compliance, the value isn't in having the document: it's in being able to produce it the day it's requested, without an internal scramble to gather what's scattered.